GeoAI · Mapping from imagery

Change detection from multi-date imagery

What changed between two dates, where, and how confident the detection is, with the image evidence for each case.

Overview

What is AI change detection?

Change detection compares imagery of the same place from two or more dates and reports where the ground has changed, for example new buildings, removed vegetation or excavation. UGAC delivers each detection as a polygon with before and after image references, a change type and a confidence value, so that a reviewer can confirm or reject it.

There are two main approaches. Post-classification comparison maps each date separately and compares the maps; it gives the type of change but accumulates the errors of both maps. Direct change detection feeds both dates to one model that outputs change; it is more sensitive but needs training examples of the changes of interest.

A newer approach compares embeddings from a pretrained Earth-observation model across dates and flags places where the embedding has shifted. It needs little training data and suits broad monitoring, with a second step to confirm the type of change.

For municipal use, vendors describe the same pattern: new construction is detected from imagery and used to update assessment rolls. Such outcomes depend on the follow-up process as much as on the detection.

Deliverables

What do you receive?

Formats and the reference system are agreed before work starts.

  • Change polygons with type, area, dates, confidence and review status.
  • An evidence register linking each detection to before and after image chips.
  • Summary by ward, parcel or asset where a baseline layer exists.
  • Validation report with false-alarm and miss rates on the checked sample.
  • For repeated monitoring, a documented procedure for the next cycle.

How we work

How does the work proceed?

Every engagement moves through the same steps, with a decision point after the pilot.

  1. Selection and preparation of imagery; relative alignment and radiometric adjustment between dates.
  2. Agreement on change classes, minimum size and the baseline layer.
  3. Pilot comparison on an area with known changes.
  4. Detection by the approach that suits the data: post-classification, direct or embedding-based.
  5. Filtering of seasonal, shadow and relief-displacement effects.
  6. Analyst review of detections, with each one confirmed, rejected or marked uncertain.
  7. Validation on a sample, and delivery of the change layer and evidence register.

Have data for this?

Describe what you hold and what you need to decide. We will tell you whether the data can support it.

Send a short brief

Before you start

What data do you need to provide?

Send a description first. Project data is transferred only after scope and transfer method are agreed.

Inputs for change detection
InputWhat we need to knowWhy it matters
Imagery datesTwo or more dates, sensors, resolutions and view angles.Different sensors or angles raise false alarms and need extra preparation.
Co-registrationWhether dates are aligned to each other and to control.A one-pixel shift creates false change along every edge.
Change of interestNew buildings, extensions, demolition, vegetation loss, excavation, water spread.Defines the classes and the minimum size.
Baseline layerExisting building, parcel or asset layer.Lets change be reported per property or asset.
Monitoring cycleOne-off comparison or repeated monitoring.Repeated monitoring needs a consistent image source.

Quality

How is accuracy checked?

Change is rare: in most areas far less than a tenth of the ground changes between dates. Overall accuracy is therefore misleading, since a map that reports no change at all would score highly. We report precision and recall for the change class, on a sample stratified so that detected-change, no-change and buffer areas are all represented, in line with good practice for change maps.

For municipal and compliance use, the false-alarm rate is stated per hundred detections so that field teams can plan their effort.

Scope

What are the limits?

Stated up front, so that the output is used for what it can support.

  • Changes smaller than a few pixels, interior changes and added floors are generally not visible from above.
  • Different seasons, sun angles and tall-building lean produce apparent change.
  • A detection shows a physical difference between two dates. It does not establish permission status, ownership or liability.
  • Results depend on the availability of clear imagery near the dates of interest.

This page describes a service we scope for each engagement. It does not report results from a completed client project.

Questions

Common questions

How often can change be monitored?

As often as suitable imagery is available. Free 10 m imagery repeats every few days but shows only larger changes; high-resolution monitoring depends on tasking or archive purchases and on budget.

Can it detect unauthorised construction?

It can detect new or extended structures. Whether a structure is authorised is a matter for the authority's records and field verification.

Why do false alarms occur?

Mostly from misalignment between dates, seasonal vegetation, shadows and building lean. Preparation and analyst review reduce them; the report states the remaining rate.

Can drone and satellite images be compared with each other?

It is possible but harder, because resolution and viewing geometry differ. Comparing like with like gives more reliable results.

How are cost and delivery time agreed?

We review the data, the pilot area, the outputs and the acceptance criteria before proposing cost and delivery time. Send a short brief through the enquiry form and agree a suitable transfer method before sharing project data.