GeoAI · Mapping from imagery

Building footprint extraction from drone and satellite imagery

Building outlines as clean GIS polygons, with completeness, correctness and positional accuracy measured on a checked sample.

Overview

What is AI building footprint extraction?

Building footprint extraction uses a deep-learning segmentation model to outline every visible roof in an orthomosaic or satellite image, then converts the result into regularised GIS polygons. UGAC scopes this work with a pilot area first, and reports completeness, correctness and positional accuracy against independently digitised reference buildings.

A segmentation model labels each pixel as building or background. Instance separation then splits touching roofs, and a regularisation step straightens edges and squares corners so that the polygon looks like a building rather than a blob. Without regularisation, raw model output has too many vertices and irregular edges to be usable in a cadastral or property database.

The work suits areas where manual digitising is too slow: property surveys, urban mapping at large scale, settlement growth studies and disaster exposure mapping. Indian programmes for rural and urban land mapping use orthorectified drone imagery at about 5 cm resolution with 1:500 scale products, which is a suitable input.

It is less suitable where roofs are hidden by tree canopy, where buildings share continuous roofs with no visible break, or where the decision depends on plot boundaries rather than roof outlines.

Deliverables

What do you receive?

Formats and the reference system are agreed before work starts.

  • Building polygons in GeoPackage, File Geodatabase or Shapefile, in the agreed reference system.
  • Attributes such as unique ID, area, source image and date, confidence, and a review flag.
  • An accuracy report with the sampling method, per-stratum results and examples of typical errors.
  • A list of areas where the imagery could not support extraction, with the reason.
  • A short model record describing training data, intended use and known limits.

How we work

How does the work proceed?

Every engagement moves through the same steps, with a decision point after the pilot.

  1. Data checkResolution, coverage, cloud, shadow and seams are reviewed, and unsuitable tiles are reported before work starts.
  2. SpecificationFeature definitions, minimum size, topology rules and the attribute schema are agreed in writing.
  3. Pilot areaA representative sample of dense, sparse and mixed neighbourhoods is processed and measured.
  4. Model choiceA pretrained model is adapted to your imagery, or a task-specific model is trained where the pilot shows a gap.
  5. Extraction and regularisationSegmentation, instance separation, edge regularisation and topology cleaning.
  6. ReviewFlagged low-confidence areas are checked by an analyst; edits are recorded.
  7. Validation and handoverAccuracy is measured on reference data kept apart from training, and the layers and report are delivered.

Have data for this?

Describe what you hold and what you need to decide. We will tell you whether the data can support it.

Send a short brief

Before you start

What data do you need to provide?

Send a description first. Project data is transferred only after scope and transfer method are agreed.

Inputs for building footprint extraction
InputWhat we need to knowWhy it matters
ImageryOrthomosaic or satellite scene, ground resolution, capture date, bands and format (GeoTIFF or COG preferred).Resolution sets the smallest building and the edge precision that can be recovered.
OrthorectificationWhether a true orthophoto or a standard orthophoto, and the elevation model used.Building lean in standard orthophotos shifts roof outlines away from the ground footprint.
Reference systemCoordinate reference system, datum and any ground control or check points.Positional accuracy can only be stated against a known reference.
Existing layersAny earlier building layer, property register or field survey.Used as reference data for validation or as a starting point for change detection.
SpecificationMinimum building size, treatment of sheds, courtyards and under-construction structures, and the attribute schema.These rules decide what counts as a correct or missed building.

Quality

How is accuracy checked?

Footprints are scored at object level, the approach used in public benchmarks: an extracted polygon counts as correct when its intersection-over-union with a reference building reaches 0.5. From this we report precision (how many extracted polygons are real buildings), recall (how many real buildings were found) and F1. Precision and recall are reported separately because benchmark experience shows that methods with similar recall can differ widely in false positives.

Positional accuracy is measured separately, as RMSE against independent check points. The ASPRS standard, Edition 2, sets a minimum of 30 checkpoints for a product accuracy assessment and reports accuracy as RMSE.

Results are reported by stratum, for example dense core, planned layout, peri-urban and rural, because a single average hides the areas where the model is weak.

Quality measures reported for building footprints
MeasureWhat it tells youHow it is obtained
Recall (completeness)Share of real buildings that were found.Reference buildings matched at IoU 0.5 or more.
Precision (correctness)Share of extracted polygons that are real buildings.Extracted polygons matched to reference buildings.
Shape agreementHow closely the outline follows the roof.Mean IoU of matched pairs.
Positional accuracyOffset of corners from true ground position.RMSE against independent check points.
TopologyOverlaps, gaps, self-intersections and slivers.Automated rule checks on the delivered layer.

Scope

What are the limits?

Stated up front, so that the output is used for what it can support.

  • Dense settlements with shared walls and continuous roofs are often merged into one polygon; splitting them may need field input.
  • Tree canopy, deep shadow and temporary covers hide roof edges.
  • In standard orthophotos, tall buildings lean; the roof outline is then offset from the ground footprint.
  • Open building datasets show that completeness and positional accuracy differ between cities and in deprived areas, so results from one area should not be assumed for another.
  • A footprint does not establish a legal boundary, ownership, use or number of floors.

This page describes a service we scope for each engagement. It does not report results from a completed client project.

Questions

Common questions

What imagery resolution is needed for building footprints?

Published work normally uses imagery finer than 2.5 m for building footprints. For property-level mapping, drone or aerial orthomosaics at 5 to 15 cm give clean edges; 30 to 50 cm satellite imagery is workable for larger buildings. The pilot area confirms what your imagery supports.

Can footprints be used for property tax assessment?

They can support it by showing built-up area and new structures. Assessment still needs the authority's own rules, field verification and the property register; a footprint alone does not decide liability.

How are buildings under trees handled?

They are reported as not extractable from that imagery. Options are leaf-off imagery, oblique imagery, LiDAR or field completion.

Do you use open datasets such as Google or Microsoft buildings?

They can serve as a starting layer or a comparison, with their licence terms respected. Their accuracy varies by location, so they are checked against local reference data before use.

How are cost and delivery time agreed?

We review the data, the pilot area, the outputs and the acceptance criteria before proposing cost and delivery time. Send a short brief through the enquiry form and agree a suitable transfer method before sharing project data.

Start with the problem

What does your team need
to know, measure or monitor?

Discuss your project