GeoAI · Assurance and enablement

Independent accuracy assessment of GeoAI outputs

An independent answer to one question: can this AI-produced layer be accepted for its purpose?

Overview

What is an independent GeoAI accuracy assessment?

An independent accuracy assessment tests an AI-produced map or detection set against reference data that the producer did not use. UGAC designs the sample, builds or collects the reference, measures positional and thematic accuracy with confidence intervals, and reports whether the product meets the acceptance criteria, with the failure cases shown.

Large mapping programmes now produce AI-extracted features faster than they can be checked. NAKSHA reporting in May 2026 showed 2D feature extraction completed in 114 urban local bodies while ground truthing was fully complete in 44. The checking step is where quality is established.

Accuracy quoted by a producer is commonly measured on a random split of the producer's own data. Research on evaluating geospatial machine learning explains why such figures can misstate performance: nearby samples are alike, so a random split tests the model on data it has effectively seen. Performance in a new district, season or sensor can be lower.

An independent assessment separates three things that are often mixed: thematic accuracy (is the feature what it is labelled), completeness (what was missed or invented), and positional accuracy (is it in the right place).

Deliverables

What do you receive?

Formats and the reference system are agreed before work starts.

  • Assessment report with method, results and a clear statement against each criterion.
  • Error matrix and per-class or per-stratum figures with confidence intervals.
  • Positional accuracy statement as RMSE with the number of check points.
  • A sample dataset of errors with locations, for the producer to correct.
  • The reference dataset, where its licence allows, for reuse in future checks.

How we work

How does the work proceed?

Every engagement moves through the same steps, with a decision point after the pilot.

  1. Review of the specification and agreement on what is tested and the pass criteria.
  2. Sampling designUnits, strata, sample size and allocation, documented in advance.
  3. Reference dataIndependent interpretation by two analysts with adjudication, field checks or surveyed points.
  4. Measurement of thematic accuracy and completeness.
  5. Measurement of positional accuracy against check points.
  6. Topology and attribute checks on the full dataset.
  7. Report with results, confidence intervals, failure cases and a pass or fail statement.

Have data for this?

Describe what you hold and what you need to decide. We will tell you whether the data can support it.

Send a short brief

Before you start

What data do you need to provide?

Send a description first. Project data is transferred only after scope and transfer method are agreed.

Inputs for an independent accuracy assessment
InputWhat we need to knowWhy it matters
Product under testThe delivered layers with their specification and metadata.The test is made against what was specified.
Source dataImagery or point cloud from which the product was derived.Lets errors be traced to data or to method.
Acceptance criteriaContract thresholds, or the purpose from which thresholds can be derived.Agreed before testing so that the result is not open to argument.
Reference optionsField access, existing surveys, higher-resolution imagery.The reference must be of higher quality than the product.
Strata of interestArea types or classes where performance matters most.The sample is allocated so that these are adequately tested.

Quality

How is accuracy checked?

Thematic accuracy follows the good-practice framework of Olofsson and co-authors: a probability sample, a reference classification of higher quality than the map, an error matrix in area proportions, and user's and producer's accuracies with confidence intervals. Departures from the design are documented.

Positional accuracy follows the ASPRS standard, Edition 2: at least 30 checkpoints for a product assessment, results as RMSE, and the accuracy of the checkpoints themselves taken into account. Object-level products such as building footprints are scored by matching at an IoU threshold, as in public benchmarks.

What each quality element answers
Quality elementQuestion answeredTypical measure
CompletenessWhat is missing, and what is present that should not be?Omission and commission rates; recall and precision.
Thematic accuracyIs each feature correctly classified?Error matrix, user's and producer's accuracy.
Positional accuracyIs each feature in the right place?RMSE against independent check points.
Logical consistencyDoes the data obey its own rules?Topology and schema validation.
Temporal qualityWhat date does the data represent?Source dates and currency statement.

Scope

What are the limits?

Stated up front, so that the output is used for what it can support.

  • An assessment describes the product tested; it does not certify the vendor or future deliveries.
  • Reference data has its own error, which is evaluated and stated.
  • Small samples give wide confidence intervals; the design balances cost and certainty.
  • UGAC does not assess a product it has produced itself as independent; such checks are labelled internal.

This page describes a service we scope for each engagement. It does not report results from a completed client project.

Questions

Common questions

How many samples are needed to validate a map?

It depends on the number of classes and the precision required. A few hundred well-allocated samples are common for thematic maps, and at least 30 check points for positional accuracy under the ASPRS standard.

Why is the vendor's reported accuracy not enough?

It is usually measured on data similar to the training data. An independent test on your area, with reference data the vendor has not seen, shows performance where you will use the product.

Can you assess open datasets before we rely on them?

Yes. Open building and land-cover datasets vary in quality from place to place, and a local assessment shows whether they suit your purpose.

Will you help fix the errors found?

The error sample is delivered so that the producer can correct systematically. Correction work, if wanted from UGAC, is scoped separately so that the assessment stays independent.

How are cost and delivery time agreed?

We review the data, the pilot area, the outputs and the acceptance criteria before proposing cost and delivery time. Send a short brief through the enquiry form and agree a suitable transfer method before sharing project data.

Start with the problem

What does your team need
to know, measure or monitor?

Discuss your project